KTR to lay foundation stone for elevated corridor, flyover

Hyderabad, July 9 (INN): Municipal Administration Minister K. Tarakarama Rao will lay the foundation stone for the construction of 4-lane Bi-directional Elevated Corridor from Indira Park to VST (Phase-I) on July 11.

According to GHMC Mayor Dr. B. Rammohan, the Minister will also lay the foundation stone for the construction of 2nd level three-lane bi-directional Grade Separator from Ram Nagar to Baghlingampally (Phase—II) on the same day. These projects are being constructed at a cost of Rs. 426 Crores.

Show More

Related Articles

Close